Project 2

Project 2: Website Redesign, Multiple Due Dates

This project has multiple deadlines, but the final project deliverables will be due in class on Thursday, 10/2.

Project Description

As a group, you will pick a website that you feel is poorly designed. Then, using the design concepts we have been discussing, you will redesign the look and structure of the website.

Project Goals

  • Develop the ability to differentiate between bad and good design and articulate the differences.
  • Practice making good design choices
  • Learn to plan a website

Project Deliverables

  • Initial project memo (Due by the end of class on 9/18), which should:
  • ID the website you have chosen
  • Outline the issues you plan to address through your redesign
  • Articulate project roles for each group member
  • Website redesign plan (Due 9/25) (must include site map)
  • Redesigned website mock-up (Due10/2) (can be electronic or paper-based)
  • Final website project memo (Due 10/2), which should include:
  • How your redesigned site addresses the issue identified in the intial project memo.
  • Areas in which your redesign was successful.
  • Areas in which your redesign may still require more work
  • Attach brief evaluations from each team member of the work performed by each fellow team member